‘Behind the meter’ projects using on-site energy resource

Entirely replace the need for a met mast within an Energy Yield Analysis wind / measurement campaign. Wind turbines erected based on wind data from ZX 300 wind Lidar can help decarbonise and support the electrification of site operations. If required, our Lidar remote power supply units support off grid operation as is common in the mining industry
Back to all Use Cases